
Technology Category
- Processors & Edge Intelligence - System on a Chip
Applicable Industries
- Aerospace
The Challenge
Rising development and maintenance costs comprise the key business challenge of testing and verification for NASA IV&V. Because of their complexity and stringent safety requirements, most NASA projects take many years to come to fruition.
The Customer
About The Customer
NASA is the agency of the United States Federal Government responsible for the civilian space program, as well as aeronautics and aerospace research, with more than 17,000 employees.
The Solution
Wind River Simics, simulating a BAE RAD750 processor, enables target software to run on the virtual platform the same way it does on physical hardware. Along with Simics' capabilities of scripting, debugging, inspection and fault injection, it enables users to define, develop and integrate their systems without the constraints of physical target hardware.
Software Components
- Wind River Simics
Software Components
- Wind River Simics
Operational Impact
Quantitative Benefit
Case Study missing?
Start adding your own!
Register with your work email and create a new case study profile for your business.
Related Case Studies.

Case Study
Aircraft Predictive Maintenance and Workflow Optimization
First, aircraft manufacturer have trouble monitoring the health of aircraft systems with health prognostics and deliver predictive maintenance insights. Second, aircraft manufacturer wants a solution that can provide an in-context advisory and align job assignments to match technician experience and expertise.

Case Study
Airbus Soars with Wearable Technology
Building an Airbus aircraft involves complex manufacturing processes consisting of thousands of moving parts. Speed and accuracy are critical to business and competitive advantage. Improvements in both would have high impact on Airbus’ bottom line. Airbus wanted to help operators reduce the complexity of assembling cabin seats and decrease the time required to complete this task.

Case Study
Aerospace & Defense Case Study Airbus
For the development of its new wide-body aircraft, Airbus needed to ensure quality and consistency across all internal and external stakeholders. Airbus had many challenges including a very aggressive development schedule and the need to ramp up production quickly to satisfy their delivery commitments. The lack of communication extended design time and introduced errors that drove up costs.

Case Study
Developing Smart Tools for the Airbus Factory
Manufacturing and assembly of aircraft, which involves tens of thousands of steps that must be followed by the operators, and a single mistake in the process could cost hundreds of thousands of dollars to fix, makes the room for error very small.

Case Study
SAP Leonardo Enabling Rocket Science
At times, ULA has as many as 15 different operating systems dedicated to overlapping processes, such as rocket design, testing, and launch. Multiple systems created unnecessary costs and unwanted confusion among workers at offices, factories, and launch sites in different location. In order to improve collaboration and transparency during vital activities that directly influence mission success, ULA wanted to improve data sharing and streamline manufacturing processes.