Case Studies.
Add Case Study
Our Case Study database tracks 18,927 case studies in the global enterprise technology ecosystem.
Filters allow you to explore case studies quickly and efficiently.
Download Excel
Filters
-
(5,794)
- (2,602)
- (1,765)
- (764)
- View all
-
(5,073)
- (2,519)
- (1,260)
- (761)
- View all
-
(4,407)
- (1,774)
- (1,292)
- (480)
- View all
-
(4,158)
- (2,048)
- (1,256)
- (927)
- View all
-
(2,488)
- (1,262)
- (472)
- (342)
- View all
- View all 15 Technologies
- (1,732)
- (1,626)
- (1,605)
- (1,461)
- (1,423)
- View all 42 Industries
- (5,782)
- (4,114)
- (3,091)
- (2,780)
- (2,671)
- View all 13 Functional Areas
- (2,568)
- (2,482)
- (1,866)
- (1,561)
- (1,537)
- View all 127 Use Cases
- (10,333)
- (3,499)
- (3,392)
- (2,982)
- (2,593)
- View all 9 Services
- (503)
- (432)
- (382)
- (301)
- (246)
- View all 737 Suppliers
Selected Filters
|
Joy Mining Systems
Joy equipment faces many challenges. The first is machine integration and control. The business end of the machine has a rapidly-spinning cylinder with 6-inch diamond-studded cutting teeth. It chews through rock at rates measured in tens of tons per minute. The system grinds through the rock in front, creating a rectangular mine tunnel. Hydraulic lifters support the ceiling as the machine moves forward. Automated drills and screws drive 3-ft long screws into the ceiling to stabilize it. The rock and coal fall into a set of gathering "fingers" below the cutting cylinder. These fingers scoop up the rock and coal and deposit it onto a conveyor belt. The conveyor passes under the machine and out the back. A train of conveyor belt cars, up to a mile long, follows the cutter into the mine. The rock shoots along this train at over 400 feet per minute until it empties into rail cars at the end. Current systems place an operator cage next to the cutter. Choking dust (potentially explosive), the risk of collapse and the proximity of metal and rock mayhem make the operator cage a hazardous location.
|
|
|
Smart energy by Mobisol
A key aspect of Mobisol’s business model is ensuring that the agreed installments are paid on time. Therefore, the solar home systems needed to be fitted with SIM cards that cannot be removed without destroying the devices. If payments are not made the system can be switched off remotely. Mobisol was looking for a mobile partner that was able to provide SIMs and mobile coverage in the across the east African countries in which it operates.
|
|
|
Enabling RCM & TPM for Energy Sector
The customer company need a centric-view of all equipment & assets, so as to enable RCM (Reliability-Centered Maintenance) and TPM (Total Productive Maintenance) process. The customer's goal is to fully utilize the life-cycle of equipment and thus improving their OEE (Overall Equipment Effectiveness).
|
|
|
Refrigeration Plant in Climatic Wind Tunnel
Johnson Controls has advised Jaguar Land Rover on matters relating to the service, maintenance and repair of the Heating, Ventilation, Air Conditioning & Refrigeration (HVAC&R) systems installed at the Gaydon Centre for almost 20 years. In 2012 we were invited to submit a proposal for replacement of the evaporator installed in the Climatic Wind Tunnel. In a ‘Site Survey Report’ submitted to Jaguar Land Rover, we drew their attention to the key factors that we believed were behind the evaporator’s less then optimum level of performance. The bulk of these stemmed from the fact that the existing evaporator was over 20 years old and throughout its working life a number of design changes had been made to the overall system that it formed a part of, thus rendering it no longer fit for purpose. Examples of such key factors included: • The old evaporator’s level of performance was now too ‘industrial’. It was capable of operating within a temperature range of -40°C and +55°C, while projected requirements were for a temperature range of between -10°C and +50°C. • Our concerns were raised over the suitability of the existing heat transfer fluid being used, which was proving to be highly corrosive. • The old evaporator was still operating on the soon to be banned R22 refrigerant. The use of all HCFCs for the service and maintenance of HVAC&R systems will become a criminal offence from 1st January 2015.
|
|
|
CONDITION MONITORING
Parker wanted the ability to apply a common cloud-based remote monitoring platform across many applications. Compressed air can be expensive and inefficient, so Parker’s innovative Transair piping system was chosen as the initial host product. Parker had a unique chance to create a solution that would help facility managers understand their compressed air systems’ key performance so that they could efficiently manage and optimize this critical system.
|
|
|
Smart City Spotlight (Paris)
The challenge with the city of Paris was to improve multiple city services and as a hub for smart city innovation, Paris has committed to reduce public lighting energy consumption.
|
|
|
ELI LILLY ADOPTS MICROMEDIA’S ALERT NOTIFICATION SYSTEM
Pharmaceutical production is subject to a strict set of enforced rules that must be adhered to and compliance to these standards is critically necessary. Due to the efforts of WIN 911’s strategic partner Micromedia, Lilly was able to adopt an alarm notification infrastructure that integrated smoothly with their existing workflows and emergency hardware and protocols. These raw energy sources enable the industrial process to function: electricity, WIN-911 Software | 4020 South Industrial Drive, Suite 120 | Austin, TX 78744 USA industrial steam, iced water, air mixtures of varying quality. Refrigeration towers, boilers and wastewater are monitored by ALERT. Eli Lilly identified 15000 potential variables, but limitations compelled them to chisel the variable list down to 300. This allowed all major alarms to be covered including pressure, discharge, quantity of waste water discharged,temperature, carbon dioxide content, oxygen & sulphur content, and the water’s pH.
|
|
|
Improving connectivity to remote areas with Rennicks MTS
Rennicks’ solutions experienced issues with communications in Scotland, where poor network coverage in remote locations was causing problems for some of its Variable Message Signs (VMS). Loss of connectivity meant more site visits had to be made to manually adjust signs, which was proving to be costly while the root cause of the problem was not being addressed.
|
|
|
King's Hawaiian Standardizes Technology Requirements
King's Hawaiian wanted to create a common infrastructure for machine builders for fi rst centralized data-collection system on a greenfield site
|
|
|
Hillshire Brands Improves Yield with Manufacturing Intelligence Strategy
Hillshire Brands's weight variance in one-pound sausage rolls was driving up product giveaway and lost revenue.
|
|
|
Alcan Achieves Early Start Up with AMS
Alcan had a tight schedule to expand its bauxite to alumina mineral processing refinery from 2.2 to 3.8 million tons. Alcan’s challenge included balancing the capital cost, minimizing the number of construction personnel on-site, integrate the green-field and brown-field facilities without affecting current operating facilities whilst achieving project budget, schedule and quality.
|
|
|
Smart Lighting Remotely Controls Lighting Fixtures
WLS Lighting Systems wanted to launch a wireless product that helped their lighting system customers remotely monitor properties and lower overall energy costs. The system needed to be simple to deploy yet robust enough to withstand all outdoor elements of sun, wind, rain and snow.
|
|
|
Testing Engagement for a Fortune 500 Manufacturing Company
The client wanted to reduce operating costs while increasing efficiency and consistency within the IT and quality assurance organizations. Executive management mandated continuous process improvement, but the environment lacked consistent processes or tools to manage. A cost-effective software testing was needed.
|
|
|
Safety First with Folksam
The competitiveness of the car insurance market is driving UBI growth as a means for insurance companies to differentiate their customer propositions as well as improving operational efficiency. An insurance model - usage-based insurance ("UBI") - offers possibilities for insurers to do more efficient market segmentation and accurate risk assessment and pricing. Insurers require an IoT solution for the purpose of data collection and performance analysis
|
|
|
Ascend Performance Materials Case Study
Ascend operations must access multiple software systems to manage day-to-day operations in an effective and secure manner. These systems generate large sets of data which contain critical information pertaining to management systems, planning and cost information in business systems and energy consumption. As a result, Ascend management was challenged with creating relevant reports reflecting performance measures in overall context of their operational process. The company’s previous process entailed collecting and analyzing data manually which was not effective, since the information collected was generated after the fact, and was too complex for collaborative use across the organization.
|
|
|
Keeping Your Home Safe with Aladdin Connect™
In a highly competitive market, Genie knew that security and safety was a concern for their customers. Teaming up with Exosite and Exosite’s IoT partners to leverage cutting-edge technology and meet consumer needs made perfect sense. Genie’s goal was to go to market quickly to keep pace with the quickly evolving home automation market. Research indicated that a smart device that could control multiple garage doors had market share viability and profit potential.
|
|
|
Asset Tracking
Each day, PAK picked up soiled linen which had been hand counted by its customers. On the following day, they were expected to return the exact same amount of linens. However, manual counts conducted by PAK’s customers were always inaccurate (a problem inherent to soiled counting) and not being able to return exact amounts was very problematic. PAK sought an RFID-enabled textile-tracking system to enable total linen monitoring throughout the whole linen cycle, while increasing facility and operation efficiency, preventing loss and ensuring customers receive the correct textiles. PAK chose to work with USTEK RFID Solutions, a sister company that designs and manufactures integrated RFID terminals for industrial laundry markets worldwide. It was challenging to find RFID products that operated well in the PAK facility, as the environment was damp and full of metal trolleys. After testing many different readers, chips and antennas in the facility, USTEK and PAK chose to use Impinj products due to their superior performance.
|
|
|
Patient Privacy with Added Convenience for Hospital Staff
IT department for Fraser Health wanted to implement two-factor authentication to ensure patients' privacy at the new emergency department at Surrey Memorial Hospital. This facility would be unique in that every room would be a private room, including emergency rooms.
|
|
|
Worldwide IT Leader Manages Enterprise Energy and Sustainability
To understand their complex global energy consumption and emissions footprint, Cisco needed a software solution to help them manage disparate energy- and emissions-related data inputs across their enterprise, integrate and analyze their sustainability and energy metrics, embark upon energy and emissions mitigation projects, and report results publicly. Cisco also needed to perform detailed interval analysis of their high energy-usage facilities.
|
|
|
Reducing Mean Time to Repair by 50 Percent with SmartConnect
Varian has a variety of medical instruments and cancer treatment systems that support today’s leading-edge treatment modalities with Intensity Modulated Radiation Therapy (IMRT) and Image Guided Radiation Therapy (IGRT). These treatment systems are deployed at more than 1,000 hospitals and clinics worldwide. Traditionally, system and equipment problems have required one or more service technicians to diagnose and resolve issues at the hospital site, resulting in higher costs and lost patient treatment time. For a typical treatment device, the loss of one day’s treatment time can result in 35 patients missing their treatments, which is something hospitals and patients cannot afford. Problem resolution can be complicated if incorrect or incomplete information has been provided by the operator, and also in cases where the problem cannot be recreated once the technician is on site. Operators of the Varian Acuity™ imaging system, an integrated simulator and verification tool for testing patient treatment plans, occasionally require expert assistance. Image quality optimization, solving operational problems, and tuning system performance can cost time and money for Varian and their customers.
|
|
|
Maximizing Error-proofing in Manufacturing with MES/MOM Controlled Assembly Tools
This document summarizes the error-proofing solution a leading heavy machinery manufacturer implemented and standardized on in order to greatly reduce product defects due to improperly fastened bolts in transmission systems. Electric assembly tools called nutrunners are used by assembly line workers to fasten bolts to a predetermined torque measurement. Their decision to implement a manufacturing execution system (MES) or manufacturing operations management (MOM) software to both ‘monitor’ and ‘control’ all aspects of the assembly tools and line worker processes yielded unprecedented results by reducing bolted joint failures and Warranty claims by 94%.
|
|
|
Data Capture for Afghanistan Forces
Electronic equipments on the field of Afghanistan provided information on the status of the vehicle and to identify potential threats surrounding it to the British Force. The monitoring and interpretation of this data requires robust and sophisticated digitization for data capture and communication.
|
|
|
CityPulse: Using Big Data for Real Time Incident Response Management
The City of Eindhoven is aimed to manage a street in the center of town - Stratumseind - the longest and most vibrant street in the Netherlands with more than 50 bars and nightclubs.
|
|
|
Hydro Utility Builds Foundation for Powerful Efficiencies and Protection
As the main British Columbia electric distributor, BC Hydro provides 1.9 million residential, commercial, and industrial customers with energy. The hydro utility transformed to a digital business with Cisco connected networking, security, and smart grid solutions. • Deliver reliable, high-quality services • Enable remote automation and monitoring • Connect applications over a common networking infrastructure
|
|
|
Off-Grid Demand Response Energy Solution
Smart energy and next generation buildings are one of FabCity’s key topics and the Zenodys team was invited there to provide a microgrid demand response power management solution.Next generation buildings are built with a purpose to be energy sustainable and include power-generation capabilities, windmills, solar panels, self-sufficient units, etc. These buildings can generate their own power. However, when connected to a microgrid, other opportunities open up: power exchange among buildings, common storage facility, smart power management, etc. This will become an important part of the future smart cities.Microgrids are a promising concept and are expected to become one of the main energy sources in the future. In order to function as intended, microgrids must be efficiently managed with smart demand response algorithms.The aim of a microgrid is to be as self-sufficient as possible. However, this is not always the case. When the sun shines and there is plenty of wind, the participants generate their own power. But on cloudy or windless days green energy is not always available. To compensate for this, a microgrid also features a battery that stores surplus energy and provides backup power when needed.
|
|
|
Greater Peace of Mind with Pentair
When severe weather hits, the potential damage to a home could be disastrous. Insurance claims for flooding damage exceed $3 billion per year in the United States, and most homeowners are not even covered for even basic water damage to carpet, drywall, electrical, furniture and personal items. Sump pumps are one of the best defenses against flood damage, but when storms knock out electricity, traditional sump pumps are rendered useless. As a seller of water management and equipment protection, Pentair sought a communication platform that will support a wide range of Pentair Internet-connected products.
|
|
|
5678 SMRT Corporation Case Study
5678 SMRT needed a fast, modern, scalable web reporting solution that could be accessed by numerous operators over many and diverse divisions. They wanted to extend and enhance their current HMI system, in which they had invested significant time and money, without having to replace it.
|
|
|
Cloud Approach Increases Productivity, Lowers TCO
Renesas Electronics America (REA)'s on-premises, legacy integration system required a manual process of custom coding by an on-site expert and was costly and complicated. REA needed to replace the existing system. In addition, due to relocation, REA wanted to move the data center to the cloud.
|
|
|
IIC Communication & Control Testbed for Microgrid Applications
Traditional central-station power grids operate on 15-minute output update cycles that force operators to over-generate power to compensate for potential blackouts or unexpected new power demands on the grid. Additionally, they cannot efficiently utilize the distributed, dynamic generation of renewable power sources such as solar panels or wind turbines.
|
|
|
Aerospace Manufacturer Enabled by Manufacturing Execution System to Produce Safety Critical Electronics
This document summarizes the manufacturing execution system (MES), or manufacturing operations management (MOM) solution implemented by an Aerospace parts manufacturer in order to introduce full-accountability into their assembly processes. The MES/MOM delivered “integrity of process” by providing a control system which managed all aspects of the assembly process; and created a closed-loop of accountability, delivering the desired results every-single-time.A critical aspect to the achievement of their goal was the management of a new assembly line workforce. The true test of the dependability on the MES/MOM system was it empowered operators with little to no experience to build sophisticated electronic components to the highest quality standards. It is also noteworthy that the MES/MOM was able to be integrated and operational in a very short time frame in less than four (4) days.
|
|